Skip to content
Fort Lauderdale · Commercial Metallic Floors

Metallic floors for rooms that sell.

Poured metallic resin with depth and movement, built commercial-tough underneath. For showrooms, lobbies, restaurants, and any room where the floor is part of the pitch.

01 / The System
Service
Poured metallic epoxy
Coverage
Fort Lauderdale and Broward County
Approval
Sample boards poured in your room
Install
Three to four days, room to itself
Walk-on
24 hours, furniture at 48 to 72
Installer spreading metallic epoxy resin across a prepared floor
Fort Lauderdale, FL

How the depth actually happens

Metallic pigment is reflective mica suspended in a clear or tinted epoxy. When we pour it and work it, the pigment particles orient themselves in the resin, and because they are catching light at slightly different angles across the floor, your eye reads variation in depth that is not physically there. The surface is flat. The look is not.

The pattern comes from how we move the material. Different tools and techniques produce distinctly different results. Some floors get a slow, wide movement that reads like polished stone or clouded marble. Some get worked harder for tighter, more turbulent movement. Some get a solvent or air treatment that opens small cells and craters in the surface for a mineral, geological look.

Every one is genuinely one of a kind. Two floors poured from the same pigment on the same day by the same crew will not match, which is the point and which is worth understanding before you commission one.

Choosing a look before we pour

Because it cannot be undone once it cures, we spend real time upfront.

We pour physical sample boards, actual epoxy on actual board, in your pigment combination. We set them in your room, under your lighting, at the time of day the space is busiest. A metallic that looks dramatic under a photography light can go flat under a restaurant’s warm dim, and a subtle pearl can look muddy under a showroom’s cool bright LEDs.

We also talk about how much movement you want. High-contrast pours with strong veining and cratering photograph beautifully and make a statement. Low-contrast pours in a single family of tones read as sophisticated and age better in a space where the floor is supposed to support the room, not compete with it. For most Fort Lauderdale hospitality and retail work, the quieter version is the one people are still happy with in year six.

Fort Lauderdale, FL

Coverage across Fort Lauderdale.

We install commercial Metallic Floors across Fort Lauderdale and the surrounding trade area, phased around your operating hours rather than ours.

Appearance and build

A floor that has to look good and take a Friday night

Metallic is the one system on our list that gets specified for how it looks.

01 / DEPTH

The look is optical, the floor is flat

Metallic pigment is reflective mica suspended in clear or tinted epoxy. When we pour and work it, the particles orient in the resin and catch light at slightly different angles across the room, so your eye reads depth that is not physically there.

02 / WEAR

The urethane is what takes the abuse

The metallic layer is appearance. Multiple coats of commercial-grade clear urethane on top are the actual wear layer, and that is exactly where a cheap install cuts corners.

03 / ONCE

It cannot be undone after it cures

Two floors poured from the same pigment on the same day by the same crew will not match, which is the point of the finish and the reason we spend real time before the pour.

The detail

Built for commercial traffic, not a garage

The performance comes from the layers under and over the metallic.

We start with the same commercial prep discipline as any other install: grind to profile, moisture-test, structural crack repair, honored control joints. A moisture-blocking or high-build primer goes down as the foundation, and on a Fort Lauderdale slab with any moisture reading at all this is not optional.

Then the metallic layer, poured and worked. Then the protection: multiple coats of clear commercial-grade urethane on top, which is the actual wear layer. The metallic epoxy is the appearance. The urethane is what takes the abuse. Skimp there and the floor scratches, which is exactly how metallic got its undeserved reputation as a residential-only product.

Where sun reaches the floor, the topcoat goes aliphatic urethane so it stays clear instead of ambering, which on a light metallic is the most visible failure there is.

Where we would talk you out of it

We would rather lose the job than install a metallic floor into the wrong room.

Heavy industrial floors with forklifts, dropped steel, and dragged pallets are the wrong home for it. High-build industrial epoxy or polished concrete will serve you better and cost less.

Commercial kitchens and washdown rooms are also a no. Those need cove base, aggressive traction, and thermal shock tolerance, and a metallic floor gives up its whole visual character the moment you broadcast anti-slip aggregate through it.

Rooms with severe untreated moisture are a hard stop until mitigation is handled. A blister under an industrial grey floor is annoying. A blister under a metallic pour ruins a piece of work that cannot be spot-repaired invisibly.

High-gloss coated floor with a mirror-finish surface installed by Suncrete Coatings
Rooms that suit it

Fort Lauderdale spaces where the floor is part of the pitch

Metallic earns its cost in rooms where people are looking around while they wait, buy, or eat. Four categories cover nearly all of our commercial pours in the county.

01

Restaurants and bars

Las Olas and the downtown core, where the interior is the whole differentiator and a seamless floor also happens to beat tile grout on cleaning.

seamlessguest-facingovernight
02

Showrooms and brokerages

Yacht brokerages and marine sales floors near 17th Street and the port, plus boutique retail and hotel lobbies downtown. The product on display is already the most expensive thing in the room, so the floor has to hold its own without competing.

marineretaildisplay
03

Salons, medspas, and dental

Clients spend an hour looking at their surroundings in these rooms, so the floor gets studied more than in almost any other commercial space. Seamless and hygienic is a real functional benefit alongside the visual one, since there is no grout line to scrub and nowhere for anything to hide.

hygienicunhurriedlighting
04

Lobbies, galleries, and venues

Corporate reception areas around Cypress Creek and downtown, plus event venues, galleries, and studios through FAT Village and Flagler Village. These jobs usually run inside a renovation window or a pre-opening buildout, which suits metallic well, since the pour needs the room cleared and entirely to itself for the duration.

corporateeventconversion
Before you commit

Where we would steer you off a metallic pour

We would rather lose the line item than put this finish into the wrong room, and three situations get an honest no. Heavy industrial floors with forklifts, dropped steel, and dragged pallets are the wrong home for it, and high-build industrial epoxy or polished concrete will serve you better for less money.

The third is moisture, and in Broward it is the one that comes up most. A slab with severe untreated vapor drive is a hard stop until mitigation is handled, because a blister under an industrial grey floor is an annoyance while a blister under a poured metallic ruins a piece of work that cannot be spot-repaired invisibly. That is why a moisture-blocking or high-build primer is not optional on any Fort Lauderdale slab with a reading on it.

02 / Facts
County
Broward
Best for
Retail, hospitality, clinical
Key factor
Lighting and moisture control
Typical job
Showroom, restaurant, lobby, or salon
From walk-through to handoff

How a metallic pour runs start to finish

01

Sample boards

Real epoxy poured on board in your pigments, set in your room under your lighting, so you approve a range of movement rather than a photograph.

02

Prep and prime

Grind to profile, meter the slab, structural crack repair, joints honored, then a moisture-blocking or high-build primer as the foundation.

03

The pour

Worked continuously across the entire floor in one session, because a stopped and restarted pour leaves a visible seam. The room is cleared and ours for that day.

04

Urethane build

Multiple clear coats as the wear layer, aliphatic where daylight reaches. Walk-on at 24 hours, furniture and fixtures at 48 to 72.

Related systems

Other Suncrete coating systems.

The right system depends on the slab and the room. We will not force-fit one when another lasts longer in that space.

Straight answers

What facility managers ask us first.

Can you reproduce a specific photo we found?

We can get close on color family and general character, but not identical. Metallic is a poured, worked finish and the movement is created live by hand, so no two floors match, including two poured by the same crew from the same pigment on one day. We pour sample boards in your chosen pigments so you approve a real range rather than a single fixed image.

Is it tough enough for commercial traffic?

For retail, hospitality, offices, showrooms, and clinical spaces, yes, provided the urethane build on top is specified for commercial use. That topcoat is the wear layer and it is where a cheap install cuts corners. For forklift traffic, dropped steel, or dragged pallets, we would put you on high-build industrial epoxy or polished concrete instead.

What happens if it gets damaged?

Minor topcoat scratches and dulling are handled by scuffing and recoating the urethane, which is a one-night job and leaves the metallic layer untouched. Deep gouges that reach the metallic layer are harder, since spot repairs in a poured finish rarely blend invisibly. That is why the walk-off mats and furniture pads conversation happens at handoff, not later.

Will it be slippery in a restaurant or lobby?

A gloss urethane topcoat is comparable to polished stone or sealed tile, so it needs the same attention: walk-off mats at entries and prompt spill cleanup. Where a room needs more, we can add a fine traction additive to the topcoat in specific zones. It slightly reduces the gloss, so we decide zone by zone rather than treating the whole floor.

How long will our space be out of service?

Typically three to four days for a standard commercial room. Unlike our other systems, a metallic pour cannot be phased, because the material has to flow continuously across the whole floor to avoid a visible seam. The room needs to be fully cleared and ours for the duration. Walk-on comes at about 24 hours after the last coat, furniture and fixtures at 48 to 72.

Resurface My Floor · 24-hour reply

Got a slab? Let’s pour it right.

Photo plus square footage plus what happens in the room equals a real quote in 24 hours. Commercial Metallic Floors across Fort Lauderdale and the surrounding area, on your hours.

See the work first

Finished commercial floors from across South Florida. Have a look, then tell us about your room.