We pour Kendall floors flat before anything goes on top.
A slab can look flat and still be far enough off to show under a new floor. An old tile bed, a room addition poured beside the original house, a garage turned into living space with a step or a low corner: each one leaves the concrete uneven. We measure it, decide whether grinding will do or a pour is needed, and when it is, we pour a self-leveling overlay that gives the next floor a true base.
- Straightedge
- Highs and lows mapped
- Moisture
- Meter before priming
- Primer
- Seals the slab for the pour
- Pour
- Raked and rolled to depth
- Quote
- (786) 488-5057
Why a slab that looks flat often is not.
Stand in an empty room and most slabs look level. Lay a long straightedge across the same floor, slide a light behind it, and the gaps appear: a dip near the middle of the room, a hump at a joint, a corner that drops away. Carpet hides all of that. A thin coating, a polished finish or a run of large-format tile shows every bit of it.
Houses collect unevenness over the years. Pulling out an old tile floor can leave craters where the mortar bed broke away in chunks. A room addition gets poured at a different time from the original house and rarely meets it at exactly the same height. A garage turned into living space is the classic case, because a garage slab is poured to slope toward the door so water runs out, and that slope is still there when the room becomes a bedroom or a den.
We map the floor on the walkthrough with a straightedge and mark the highs and lows. That map decides the plan: grind the high spots down, pour the low areas up, or do some of each.
A self-leveling overlay is a cement-based material mixed thin enough to flow and settle at its own level across the slab. Poured correctly, it gives the next floor a flat, sound base. Poured over a slab with problems nobody dealt with, it carries those problems straight up into the new floor.
Leveling the slab under Kendall homes.
In Kendall, the floors that need leveling usually sit inside family homes and townhomes: converted garages, room additions, rooms coming out of old tile, and the occasional two-car or three-car garage getting a coating that wants a flatter start. Our own installers do the mapping, the priming and the pour, with no subcontractor on the slab. Finished work is in the project gallery, and our Kendall page covers the rest of what we install here.
Grind it down or pour it up.
The straightedge map tells us which tool the floor needs. Here are the three ways it usually goes, and what decides between them.
Grinding alone
Small high spots, a lip at a control joint or a ridge of old thinset come down with the diamond grinder. When the lows are shallow and few, grinding plus a skim of repair mortar can be enough, and the floor skips the pour.
A full pour
Wide low areas, a sloped garage floor, or a room left cratered by tile removal get a self-leveling overlay across the whole space, so the base comes out flat from wall to wall instead of patched in pieces.
Grind, then pour
Plenty of floors need both. We take the high spots down first so the overlay does not have to build up around them, which keeps the pour thinner and more even across the room.
Inside a self-leveling pour.
Once the slab is ground, repaired and primed, the pour itself moves quickly. Every tool on the floor has one job, and the crew works them in a set rhythm.
Edge strips and dams
A temporary strip along the walls and across doorways holds the material where it belongs, keeps it out of the next room, and gives a clean stopping line at a threshold.
Primer
The primer seals the open concrete so the slab does not pull water out of the overlay too fast, and it helps the pour bond. Skipping it is how overlays end up full of pinholes or letting go from the slab.
Mixing and the working window
Self-leveler only flows for a limited time after it is mixed, so the crew mixes and places batch after batch in a steady rotation. A gap in that rhythm leaves a seam you can see and feel.
Gauge rake and spiked roller
A gauge rake spreads each batch to the set depth. A spiked roller then works the surface to release trapped air and help each batch knit into the one placed beside it.
What an overlay cannot fix on its own.
A crack that is still moving will come back up through an overlay. Before we pour, we look at every crack and judge whether it is an old, stable shrinkage crack or one that is still opening. A moving crack gets treated first, and sometimes the honest answer is that the slab needs work an overlay was never meant to do.
A wet slab is the other limit. Moisture moving up through the concrete can break the bond between the slab and the overlay, then show up later as blisters in whatever coating goes on top. The moisture meter comes out before the primer does, and a high reading changes the plan.
A slab that has settled or heaved since the house was built is a structural question. An overlay can flatten the surface above it, but if the ground under the slab is still moving, the new floor will keep following it. When we see signs of that, we say so on the walkthrough, before anyone mixes a bag.
After the pour, the overlay has to cure before anything goes over it. We follow the cure time the manufacturer sets for the product and the conditions in the room, meter the overlay again, and only then start the polish or the coating. Rushing that step is one way a new floor fails on top of a perfectly good overlay. You can read more on our self-leveling overlays page.
- Moving crack
- Treated before the pour
- Wet slab
- Moisture plan first
- Doorways
- Height checked at thresholds
- Cure
- Metered before the topcoat
- Settled slab
- Beyond what an overlay fixes
From a straightedge map to the topcoat.
Map
Straightedge across the room, highs and lows marked, and moisture readings taken across the slab.
Prepare
High spots ground, surface opened, stable cracks repaired, edge strips set and the slab primed.
Pour
Batches mixed and placed in a steady rotation, raked to depth and rolled to release air.
Cure and finish
The product’s cure time observed, the overlay metered again, then the polish or coating goes on.
The rest of the Kendall floor work we do.
An overlay is usually the base for something else. These pages cover the other floors and outdoor surfaces we work on in Kendall.
Answers about leveling a floor.
How can I tell if my floor needs leveling?
Lay a long, straight board on the floor and look for light under it, or watch which way a marble rolls. Doors that scrape, furniture that rocks and a step at the old garage door are other signs. We confirm it on the walkthrough with a straightedge and a map of the lows.
Can you pour an overlay over my old tile?
We take the tile up first. Loose or hollow tile under an overlay can shift and crack the new surface. Once the tile and the thinset are off, we grind the slab, fill the craters the mortar left behind, prime it, and pour over sound concrete.
Can the overlay be the finished floor?
It can be ground and polished, or it can carry a coating. Left bare, a self-leveler is a base layer and will mark and stain like raw concrete. We plan the overlay and the finish together, so the product suits whatever goes on top of it.
How long until the new floor can go over the overlay?
That depends on the product, the thickness and the conditions in the room. We follow the manufacturer’s cure time, then check the overlay with a moisture meter. Once it reads ready, the polish, coating or other flooring goes down, and not a day earlier.
Will the floor height change at my doors?
Usually a little, since the overlay adds thickness where the floor was low. We check every threshold and transition on the walkthrough, set edge strips at the doorways, and tell you ahead of time if a door or a transition strip will need adjusting.
Tell us where the floor dips.
Send a photo of the floor, the rough square footage, and a note on what bothers you about it: the step at the old garage door, the room addition that sits high, the craters left behind by tile. That gets you a real quote inside 24 hours. The walkthrough usually happens within the same week, with the straightedge and the moisture meter along for it. Call (786) 488-5057, or send it through our contact form.